At the best location in this area around the Gulf of Suez windmills might produce electricity at more than 6000 full load hours (FLh = VLh) annually.
 +
 +
Assuming the same credit conditions the same economic output here could be provided to the investor at a feed in tariff of 2.2 USct/kWh.

Aktuelle Version vom 3. Oktober 2010, 13:31 Uhr

Lecture Magdeburg [2001,en], Vortrag Lübeck [2006,de], Lecture Barcelona [2008,en], Vortrag EWEA 2000 [2000,en]
Vorstellung regenerativer Energien: Biomasse, Windenergie, Fallwindkraftwerke, Geothermie, Wasserkraft, Solarenergie
Prev.gif

LB2006-slide30.jpg

Übersicht

Anklicken für Druckversion

LB2006-slide32.jpg

Next.gif

At the best location in this area around the Gulf of Suez windmills might produce electricity at more than 6000 full load hours (FLh = VLh) annually.

Assuming the same credit conditions the same economic output here could be provided to the investor at a feed in tariff of 2.2 USct/kWh.